Use of Fixed Neutron Absorbers in Nuclear Facilities Outside Reactors
standard by American Nuclear Society, 06/20/2023
Category: ANS
ANS 19.3-2022
Steady-state Neutronics Methods for Power Reactor Analysis
standard by American Nuclear Society, 01/01/2023
ANS 19.1-1975 (N411)
Nuclear Data Sets for Reactor Design Calculations
standard by American Nuclear Society, 01/22/1975
ANS 56.6-1978
Pressurized Water Reactor Containment Ventilation Systems
standard by American Nuclear Society, 11/08/1978
ANS 19.6.1-1997
Reload Startup Physics Tests for Pressurized Water Reactors
standard by American Nuclear Society, 08/22/1997
ANS 55.2-1976 (N199)
Liquid Radioactive Waste Processing System for Pressurized Water Reactor Plants
standard by American Nuclear Society, 06/25/1976
ANS 56.8-1987
Containment System Leakage Testing Requirements
standard by American Nuclear Society, 01/20/1987
ANS 57.9-1984
Design Criteria for an Independent Spent Fuel Storage Installation (Dry Type)
standard by American Nuclear Society, 12/31/1984
ANS 55.3-1976 (N197)
Soiling water reactor liquid radioactive waste processing system
standard by American Nuclear Society, 06/25/1976
ANS 56.2-1976 (N271)
Containment Isolation Provisions for Fluid Systems
standard by American Nuclear Society, 06/28/1976